Surface Leveling & Finishing
Suitable equipment-operated surface leveling and finishing, within equipment limits, excluding permit-required projects.

Define the surface task
Describe uneven ground, shallow surface marks or material that needs distributed.
Check the work limits
Small holes, trenches and minor drainage work may be reviewed where appropriate; work needing permits is declined.
Work with existing conditions
Review access and existing surface conditions before agreeing to a machine-operated finishing task.
No drainage construction
Projects needing drainage design or permits are outside the service scope. Minor drainage work may be reviewed where appropriate.
On-site material only
Drama Free does not directly haul or dispose of soil or debris. Suitable container loading can be reviewed by arrangement. Any material moved must have an agreed destination on the property.
Before work begins
Equipment-operated work only. MISS DIG 811 clearance is required before any excavation. Drama Free does not take projects requiring building, zoning, soil-erosion, environmental, excavation, or other permits. Local requirements and site conditions are reviewed before scheduling. Work is subject to equipment limits, access, ground conditions and project fit. Materials are delivered separately; work is subject to access, ground conditions and project fit.
